Solution
The Forbes Marshall team carried out a detailed survey of the
entire plant. Based on this survey, the steam network was
optimized.
Isolation valves were installed to arrest steam leakages.
Steam pressure reducing and desuperheating stations with
proper feedback mechanism were installed to optimize and
regulate steam consumption.