Design for benchmark performance

Utilities like Steam, Compressed Air, Hot Water, Thermic fluid, etc have a huge influence on your production aspirations and energy footprint. Benchmark plants are able to meet desired production capacities with lower rejection ratios, higher equipment availability and 20-30% lower utility energy footprint than conventional plants. 

The key difference in a benchmark plant that makes this possible is the proper integration of the production process with the utilities during the design stage. 

The conventional approach to utility design is based on computing the loads and adding a safety factor resulting in rigid utilities that cannot cater to the dynamic requirements of your process. The importance of the right integration of the production process with the utilities is an aspect that is frequently underestimated resulting in bottlenecks impacting energy, productivity and quality. 

Our unique approach to utility design focuses on understanding the requirement of your process, and then applying our utility domain expertise to design a utility system that is completely in synch with your process


 

What you can expect to gain: 

  • 10% lower Utility Capex 
  • Benchmark utility performance on energy consumption, safety, reliability, sustainability 
  • Quicker implementation timelines for your project utilities

Engineering deliverables for Utilities


Basic Engineering

Design concept note specifying utility generator capacities and configuration


Detailed Engineering

Design Concept Note

P&IDs

Layout

Isometrics

BOQs for Piping and Accessories