USD 47,700 saved annually through a condensate heat recovery system for a confectionery MNC in Thailand
A confectionery MNC in Bangkok, Thailand was facing losses due to draining of high temperature condensate. As the plant was purchasing steam from outside instead of generating it in-house, they were unable to find use for the hot condensate. Forbes Marshall conducted an audit and engineered the steam system design for the entire plant. Recommendations were implemented in phases.

Products
Associated Services

Process Optimization

Improving Uptime





















