Case Study:

An instant noodle manufacturing plant in North India with a production capacity of 22 TPD


Food

Download as a PDF

FM_CaseStudyDetailBreadcrumb

Home / Case Study / An instant noodle manufacturing plant in North India with a production capacity of 22 TPD

Problem
Losses due to improper design of steam and condensate system.
Objective
To design an optimum steam system and deliver a plant with benchmark Specific Fuel Consumption and Specific Steam Consumption.
Solution
For Steamer Section:
– Installation of Forbes Marshall recommended steam system for flash steam recovery at equipment level

– Optimisation of steam pressure in steamer

For Fryer Section:
– Process vapour heat recovery system
Benefits
– Efficient use of flash steam at equipment level

– Proper conditioning and gelatinisation of dough in the steamer

– Zero-leak zero-discharge plant

– 35% Reduction in specific steam consumption due to no steam loss