Case Study:

A sub bituminous coal fired power plant in Western India


Power

Download as a PDF

FM_CaseStudyDetailBreadcrumb

Home / Case Study / A sub bituminous coal fired power plant in Western India

Problem
Hardware and service limitations in the existing vibration monitoring and protection system installed on the circulating water pump of the 800 MW power plant.
Objective
- To provide a cost-effective solution for machine protection

- To increase plant uptime
Solution
Installation of Forbes Marshall make microprocessor based Vibtrans 19” rack digital vibration monitoring system with trip relay and retransmission output.

The Vibtrans is an API-670 compliant system with redundant and hot swappable functionality for all types of modules, field selectable filters, communication with DCS and HMI via MODBUS – RS485.
Benefits
Improved plant maintenance

Enhanced operational and plant safety

Auto-shutdown facility

Increased life span of machines

Reduced costs towards inventory, manpower and energy